INSTALLATION
SupaBord is a practical temporary floor protection product that is easy to transport and install.
- Make sure the floor is clean and dry. Use a clean and dry rag to wipe outside before tape.
- Cut and lay SupaBord over the flooring, make sure the butt joints are neat and fit well together.
- Tape butt joints first with the Joint Tape. Never use the joint tape directly to the floor
- Tape the edges of the SupaBord to the floor using the Edge Tape.

FREQUENTLY ASKED QUESTIONS
Ensure it is clean and dry.
Depending on the project and the product is in reasonable condition, you can reuse SupaBord again and again.
- Floors including wood, tile, concrete, stone and linoleum
- Surfaces including stairs and bench tops.
SupaBord is safe to walk on with work boots even when wet and lays flat reduces tripping hazards.
One layer of SupaBord would be sufficient for most construction projects but if it is a heavy traffic area, we would recommend using two layers.
SupaBord is made from 100% recycled material so it can be placed in the recycling bin together with other paper based products.